Aston Martin team principal Adrian Newey has revealed his team’s 2026 car started wind tunnel development four months later than its rivals, but that hasn’t stopped the new AMR26 turning heads in testing.
Aston Martin ‘4 months behind’ but ‘spectacular’
Other News
- Queensland has joined NSW in rejecting CA’s BBL privatisation plan
- Hardik: ‘We have not been able to do what Mumbai Indians stands for’
- Travishek, Klaasen outmuscle MI as SRH chase 244 for fifth straight win
- Prendergast trumps Pavely in Blaze of glory
- Hyderabad Kingsmen mow down 160 to knock Multan Sultans out
- Wyatt-Hodge threatens heist with another ton, but Hampshire prevail